First & Second Floor Deck Packages
We offer full first and second floor "I"joist floor systems that have been drawn and laid out to meet your individual needs. The floor systems will be direct shipped to your site on a schedule that has been coordinated with the building team. The floor systems will include sill sealer, treated plates, rim board, "I" joists, construction adhesive and Advantech 3/4" subflooring.

